A comprehensive office and laboratory fit-out allowing the complete relocation of a fully functioning pharmaceutical testing lab, incorporating specialist M&E, HVAC, plumbing, laboratory services and high-quality internal finishes.

• Watford

• Research

• 16 Weeks

“I would like to reiterate what a pleasure it has been working with McFeggan Brown on this scheme. We are delighted with the finished product and the quality of the end result delivered for the client. Thank you for all of your efforts throughout the project, together with those of the wider team.”

Matt Hixson, Managing Director

Design Brief
Visual
Following a consultative design process, which dived deeply into all the aspects of their analytical operation, this empty warehouse was transformed into a large ground floor laboratory space and first-floor office via a newly constructed mezzanine.
 
Critical to the design process was the requirement to comply with Medicines and Healthcare products Regulatory Agency (MHRA) requirements. Zeta Analytical holds an official Certificate of Good Manufacturing Practice (GMP) Compliance issued by the MHRA for both human and veterinary medicinal products, and this is critical to their business operation.
 
McFeggan Brown then undertook a complete mechanical and electrical installation to create the laboratories and offices on the new mezzanine, extensive partitioning works, drylining and fireproofing.
 
Particular attention was placed on a comprehensive plan for the laboratory including fume cupboards, HVAC and data infrastructure to support advanced pharmaceutical testing requirements. This included ensuring six air changes per hour across all laboratory spaces.
Lab 2 scaled
london office fitout construction

Project Delivery

Partitions and doors were installed throughout both floors with fire walls created for the lab and rear staircase.
 
The mezzanine was aligned to health and safety standards through full protection from fire boarding.
 
Extensive HVAC included ductwork, wiring, condensers, insulation before vacuum and gas systems, and a system for the chemical extraction, all aspects finally being fully tested for completion.

Start your office journey now

Reach out to learn how we can help you make a difference.

technology8 2
Give us a call on
01275 464220
Or visit us at our offices

Related Case Studies

DSC 4855

Bath Building Society

Bath
DSC 4266

IFM

Derby
DZ0007 2148

Confidential Client

Bristol
Let’s get to work!
Talk to us about creating your perfect workspace today

D0005X 1055
DSC 4507
D0005X 1283
D0005X 1090