While experiencing issues with their existing building and being spread across 2 offices, COWI noticed a larger space available nearby which was an obvious move.

A previous design brief was adapted to suit the client’s needs after a previous company involved, and new furniture was used in-line with other projects previously completed for COWI, producing savings all around.

COWI Derby office fitout plan
COWI Derby office fitout 3D visual design

Project Delivery

Works included stripping out existing flooring and partitioning, to install new partitions, kitchen, electrics, replacement lighting, HVAC adjustments, flooring and furniture across a 12-week programme.

Validation surveys highlighted that repairs were required on existing AC condensers, providing savings by raising this before the moved in. Loose lay vinyl tiles were laid directly to the subfloor screed, saving time and cost of installing the usual plywood base. Existing meeting rooms were also used to reduce strip out costs.

Floor channels were chased in the screed for the power to the pedestal boxes on a weekend, which reduced disruption to other tenants and keep the project on track.

Start your office journey now

Reach out to learn how we can help you make a difference.

technology8 2

Give us a call on

01275 464220

Or visit us at our offices

Related Case Studies

DSC 4855

Bath Building Society

Bath

DSC 4266

IFM

Derby

DZ0007 2148

Confidential Client

Bristol

Let’s get to work!
Talk to us about creating your perfect workspace today

D0005X 1055
DSC 4507
D0005X 1283
D0005X 1090